Thursday, 27 March 2014

Evaluation Question 7

For this final question, my group and I decided that it would be best to do this as a group by creating a video of us talking about what we have learnt and zooming in on the part we were in charge of.

As a group, we all contributed to the production equally, but taking on a different task each (pre production, production and post production) whilst getting ideas from the group for each stage.

First, Ben starts by talking about the preliminary task and his lead role in the pre production stage for the final task. Then Elliot talks about the preliminary task and his lead role in the production stage and then finally I talk about the preliminary task and my lead role in Post production.

This is our video. :)


Wednesday, 19 March 2014

Production Diary

In this post, I will keep a note of what we do so that we know where we are up to and what is left to do. I will save it as a draft until we have finished up until the last part of post production.

PRE-PRODUCTION:
In the first lesson we chose the people we would like to work with. We chose the people we know we will work well with and get everything done.
We then discussed what ideas we had in mind for our opening sequence. We decided that each of us should do a mood board for what genre/theme we would like to do. I chose to do a mood board for a mystery drama film.

The next lesson we compared our storyboards and got an idea of whats similar and whats different. The similar parts were that some sort of crime will happen in the film. There was also an idea of a thriller in each of them. The only obvious difference was the location. In this lesson we also produced a pitch on a power point which we pitched to the class next lesson.

In the third lesson, we saw the other groups pitches and presented ours. This gave everyone the change to input ideas to other groups and get listen to others peoples suggestions on how we could improve.
(See my groups pitch on the 'Production Pitch' blog)

The next lesson, we discussed what we want to actually happen in our opening sequence, and where. We decided first on Oxford, as we would like to film when it gets dark at about 5pm. Oxford will give us enough light for us to film from street and shop lights. However we figured out that at 5pm in oxford it will still be very busy as people will be finishing work and college etc. So then I suggested we do it in Woodstock, this gives us the street that we want and there are street lights. And if it turns out to be difficult filming in the dark, we can film when it is still light at about half 3 and edit it so it looks like it's in the evening. We need to make it look like 5pm because our story is of a girl finishing school after staying to do some work, and if it looks too dark it might not seem realistic because not many (if any) people finish school after 6pm.

In the next two lessons, we started our storyboard. It is important to do this and the script before we start to film so we know exactly what we want like shots etc and what we need. We finished the storyboard on thursday the 28th during the fisrt lesson and in the second lesson we started the script. We decided to think of a date to aim to start filming as it will help us plan our time so that we are able to finish filming in the few weeks back after christmas. This allows us to finish our script, and shot list and get what we need for each scene so we can start filming. We also had to think about the availability of the 2 actors we have chosen to be in our opening sequence. We need to make sure they are reliable and able to make the dates we choose to film.

In the next lesson, we started our script and finished it in the lesson after. So we were able to start our shot list. We will have finished this just before the Christmas holidays so that we know what we are doing when we get back. It is hard to pick a date before Christmas as situations may come up meaning one of use of our actors can't make it.

In the first week back at school, in our media lessons we took some practice shots and have had some difficulties with some of the shots for example the low angle tilt shot whilst our actor is walking as we need the walkin pase to be continuous and casual but it was too fast to get this shot in at a high enough standard. We have arranged to film on Thursday the 16th January, as we are all available this day. This allows us about 4 weeks to edit our opening sequence.

PRODUCTION:
We had recorded on the 16th of January, and in the next lesson we have started to practice our editing skills trying out filters and effects. However, we have now decided to change location as where we chose is a bit too busy therefore doesn't fit with our 'thriller/crime' genre. We want the location to be quiet to make her look alone and vulnerable. We will now film on the 6th of February in our new location which is an alleyway.

We have now finished filming, we filmed on the 6th February and also on the 10th February. Now we need to start editing, which we will start in our next lesson on the 14th of February. In this lesson we will upload our scenes and decide on an effect and also transitions.

POST-PRODUCTION:
We have finished uploading and adding effects, however we have decided to re-do one of the clips as it was not up to the standard we wanted. We could do this in the lesson which we did and then uploaded it and added the effect we wanted.

We now half term week, but the week we get back we will continue to edit and look at possible music tracks to use.

In our lesson next lesson in the week beginning 24th February, we had a single so we looked at the possible music tracks we could use however we could not find one that would fit so we will continue to look.

In our next lesson, we tried out title fonts and colours and where they look best, towards the end of the lesson we had found the font we like, so in our next lesson we will continue to add titles.

On the 6th of March, we continues to add the titles, and we also tried to think of what we could call our production, and had a discussion on what we could name the film we are making an opening sequence for.

On the 7th of March, we only had a single lesson, so we continued to discuss what we could name our film and we decided on our production name - 'Puddle Productions'. In which we used one of our scenes to match our production name. In our next lesson on the 13th March, we will add a title and decided on music and we plan to add the music to our opening sequence.

On the 13th of March, we added the titles, and researched names we could use for our film. We had a group discussion and decided on Pursuit. As this is a double lesson, we were also able to discuss the music, we had done some research on soundcloud and found a unsigned band that fit our opening sequence. We added this music to our opening sequence and planned to go through our opening sequence in the next lesson and check everything was how we wanted it to be.

On the 18th of March, we ran through our opening sequence, and adjusted the volume of the soundtrack to the nature of the shots and then we decided we have finished and are happy with it.


I will now start to evaluate my production.